Tamamlanan Projeler
TANAP Manned Stations CCTV Camera Enhancement Project
- Installed and commissioned additional CCTV security cameras at various manned stations.
- Established infrastructure cabling, ensuring seamless system integration.
- Achieved authorization from Bosch Security System, underscoring commitment to delivering high-quality solutions.
———-
TANAP CS1 & CS5 Workstations Relocation and New Network Panels Installation Project
- Focused on the relocation of existing General Electric compressor network panels and the installation of a fully redundant network system with components mounted on a new panel at CS1 and CS5.
- Encompassed the design, production, and installation of new network panels.
- Covered hardware, software, and all aspects of the project lifecycle, ensuring a seamless transition.
———-
TANAP Thermal Gas Leak Detection System for TANAP Unmanned Stations
- Installation and Commissioning of Gas Leak Detection Thermal Cameras & GAMSPC (Local Processing Equipment and Workstations Analytics Software) at:
⚬ 49 Block Valve Stations
⚬ 5 Future Compressor Stations
⚬ 2 Dardanelles Crossing Stations
⚬ 5 Manned Stations - Equipment interconnections, Communication with SCADA and Video Management Systems.
- System Testing and Handover
———-
TEKFEN – MCC Security Control Room Extension Project
- Relocation of control systems from TANAP’s MS2 Station to MCC (Main Control Center)
- Expansion of MCC’s Security Control Room
- Installation and recommissioning of the stations
———-
TEKFEN – CS3 AMC CCTV Project
- Designed, procured, and applied a state-of-the-art security CCTV system for CS3 AMC.
- Executed the installation of fiber optic/power/data cable infrastructure.
- Obtained official registration from Bosch Security System, incorporating the BVMS/Bosch Video Management System.
———-
TEKFEN – Cathodic Protection Transformer Improvements at Stations
- Pipeline CPTR: Relocate power supply from LV distribution board to existing UPS system, install new circuit breakers, and replace power cables.
- Station CPTR: Install new UPS systems, replace power cables, and relocate CPTRs to new stands.
- Signal Cables: Install new signal cables for CPTRs at specific stations, including trenching and cable termination.
———-
TANAP Telecom/SCADA and Fiber Optic Infrastructure
- Installation, commissioning, and maintenance of telecom/SCADA systems.
- Management of LV equipment, network, security, and fiber optic infrastructure.
- Implementation of PAGA, CCTV, SCADA, PMS, ACS, and NDB systems.
- Installation and maintenance of 6000km fiber optic cable.
———-
TEIAS Antalya 19th Region – High Voltage Pylon DAS Security System Demo Test
- Conducted an international fiber sensing system test covering 60 km of high voltage pylons in collaboration with Sintela Co.
- Aimed at ensuring sensitive security measures on each pylon along the sensing route.
- Successfully utilized existing OPGW fiber cables on pylons, achieving effective detection on the alarm system.
- The simulated system provides a reliable, efficient, and cost-friendly solution by leveraging the existing infrastructure.
- High capability and sensitivity eliminate the need for new sensing cables and additional construction works on the current system.
- Demonstrated significant success in system flexibility.
———-
BAŞKENT Gaz RMS Station Infrastructural Works
- Electric menhole construction and installation
- Construction & installation of heavy vehicle type PE100 pipes
- Lighting poles groundwork construction and installation works
———-
BTC Instrument Loop Test & Commissioning
- Verifying loop diagrams against field installations.
- Confirming complete electrical & mechanical installations.
- Functional testing of all instruments & devices.
- Signal transmission & addressing verification.
- Validation of range, alarm/trip settings per data sheets, calibration reports, and process conditions.
———-
Static Transfer Switch & Additional Large Screen Installation for Control System Reliability
- Addressed the need for enhanced control system reliability at TANAP’s manned station.
- Procured, installed, and commissioned new industrial wall screens to bolster the control system.
- Comprehensive approach included design documentation, redundant power infrastructure application, and implementation of an online static transfer switch.