Tamamlanan Projeler

TANAP Manned Stations CCTV Camera Enhancement Project

  • Installed and commissioned additional CCTV security cameras at various manned stations.
  • Established infrastructure cabling, ensuring seamless system integration.
  • Achieved authorization from Bosch Security System, underscoring commitment to delivering high-quality solutions.

———-

TANAP CS1 & CS5 Workstations Relocation and New Network Panels Installation Project

  • Focused on the relocation of existing General Electric compressor network panels and the installation of a fully redundant network system with components mounted on a new panel at CS1 and CS5.
  • Encompassed the design, production, and installation of new network panels.
  • Covered hardware, software, and all aspects of the project lifecycle, ensuring a seamless transition.

———-

TANAP Thermal Gas Leak Detection System for TANAP Unmanned Stations

  • Installation and Commissioning of Gas Leak Detection Thermal Cameras & GAMSPC (Local Processing Equipment and Workstations Analytics Software) at:
    ⚬ 49 Block Valve Stations
    ⚬ 5 Future Compressor Stations
    ⚬ 2 Dardanelles Crossing Stations
    ⚬ 5 Manned Stations
  • Equipment interconnections, Communication with SCADA and Video Management Systems.
  • System Testing and Handover

———-

TEKFEN – MCC Security Control Room Extension Project

  • Relocation of control systems from TANAP’s MS2 Station to MCC (Main Control Center)
  • Expansion of MCC’s Security Control Room
  • Installation and recommissioning of the stations

———-

TEKFEN – CS3 AMC CCTV Project

  • Designed, procured, and applied a state-of-the-art security CCTV system for CS3 AMC.
  • Executed the installation of fiber optic/power/data cable infrastructure.
  • Obtained official registration from Bosch Security System, incorporating the BVMS/Bosch Video Management System.

———-

TEKFEN – Cathodic Protection Transformer Improvements at Stations

  • Pipeline CPTR: Relocate power supply from LV distribution board to existing UPS system, install new circuit breakers, and replace power cables.
  • Station CPTR: Install new UPS systems, replace power cables, and relocate CPTRs to new stands.
  • Signal Cables: Install new signal cables for CPTRs at specific stations, including trenching and cable termination.

———-

TANAP Telecom/SCADA and Fiber Optic Infrastructure

  • Installation, commissioning, and maintenance of telecom/SCADA systems.
  • Management of LV equipment, network, security, and fiber optic infrastructure.
  • Implementation of PAGA, CCTV, SCADA, PMS, ACS, and NDB systems.
  • Installation and maintenance of 6000km fiber optic cable.

———-

TEIAS Antalya 19th Region – High Voltage Pylon DAS Security System Demo Test

  • Conducted an international fiber sensing system test covering 60 km of high voltage pylons in collaboration with Sintela Co.
  • Aimed at ensuring sensitive security measures on each pylon along the sensing route.
  • Successfully utilized existing OPGW fiber cables on pylons, achieving effective detection on the alarm system.
  • The simulated system provides a reliable, efficient, and cost-friendly solution by leveraging the existing infrastructure.
  • High capability and sensitivity eliminate the need for new sensing cables and additional construction works on the current system.
  • Demonstrated significant success in system flexibility.

———-

BAŞKENT Gaz RMS Station Infrastructural Works

  • Electric menhole construction and installation
  • Construction & installation of heavy vehicle type PE100 pipes
  • Lighting poles groundwork construction and installation works

———-

BTC Instrument Loop Test & Commissioning

  • Verifying loop diagrams against field installations.
  • Confirming complete electrical & mechanical installations.
  • Functional testing of all instruments & devices.
  • Signal transmission & addressing verification.
  • Validation of range, alarm/trip settings per data sheets, calibration reports, and process conditions.

———-

Static Transfer Switch & Additional Large Screen Installation for Control System Reliability

  • Addressed the need for enhanced control system reliability at TANAP’s manned station.
  • Procured, installed, and commissioned new industrial wall screens to bolster the control system.
  • Comprehensive approach included design documentation, redundant power infrastructure application, and implementation of an online static transfer switch.